The Installation of Boiler Tubes in Power Plants
Posted: 11/11/2021 09:10:52  Hits: 6
The particularity of the power plant's manufacturing process puts forward higher requirements for the safety of the steel boiler tubes in the power plant. In the actual installation of steel boiler tubes in power plants, it is necessary to select the appropriate installation method, strictly regulate the operation process, and regularly inspect the steel boiler to ensure the normal use of the steel furnace pipe and ensure its safety during use.
 
1. Requirements for installing boiler tubes in power plants
The installation of steel boiler pipes in power plants is cumbersome. Therefore, before the installation, the installer needs to be familiar with the specific installation process, installation details and procedures. At the same time, it is necessary to carry out specific training for key procedures and error-prone procedures. Only qualified personnel can participate in the installation. When boiler tubes are installed, it is required to strictly follow the installation process. Before the actual installation, strict calibration and inspection should be carried out for the parts required by the equipment. The quality inspection department must conduct specific inspections before the pipeline is installed, and the specific assembly can be carried out only after it is qualified. When welding and hoisting the front side water wall, the superheater pipeline should be inspected after the welding. The reinforcing can be performed after the entire process is qualified, and then the specific welding can be carried out. After the boiler tube is installed, a pressure test should be conducted on the main boiler. After the boiler is operating normally, a full range of inspections and tests can be carried out on the other performance of the boiler.
 
2. Preparations for installation of boiler tubes in power plants
2.1 Accurate installation drawings
Before the installation of the boiler tube of the power plant, the drawing design should be carried out in advance, and a specific review of the construction drawings should be conducted. When designing the installation drawings, it is necessary to conduct in-depth field inspections, fully consider possible situations, ensure the scientificity and rationality of the installation drawings design, and provide an important guarantee for the orderly progress of each process. At the same time, specific construction standards and quality specifications must be formulated, and construction personnel must strictly follow the requirements of the construction specifications. When reviewing the drawings in detail, it is advisable to check and mark the location of pipelines, reserved holes and embedded parts, and make full reference to the on-site construction to ensure the scientificity and rationality of the location.
 
2.2 Materials
Before installing the boiler tube, construction materials need to be prepared in advance. When purchasing materials, you need to strictly control the quality of the materials. Carefully check the appearance of the pipe, whether the inner side is straight, and the type of connecting valve. Use an endoscope to check the heating surface of the pipe, and check whether the inside of the pipe is smooth to avoid jamming in the pipeline.

 
3. The installation of the boiler tube in the power plant
3.1 The installation of the pipe and bracket
Before installing the pipe, the hanging bracket of the pipe body needs to be installed in advance. Since the pipeline is prone to expansion during operation, it is necessary to do a good job in expansion compensation. Before installing the specific hanging bracket, carefully check pipe bodies, connectors, spring materials and models, and then install them in accordance with the drawings after they conform to the construction standards. In the installation process, the root should be ensured to have good firmness, and the spring and connecting piece nut should be ensured to be mutually tightened; the spring should have good performance. For the hanging bracket that plays the role of weighing, it is also necessary to ensure that it will not be affected by external forces, and the partial installation value is controlled within the specified range.
 
3.2 The welding of the pipeline
In the welding process of the pipeline, the specific content is mainly the welding technology, groove processing and cleaning and positioning. Before specific welding, formulate a practical welding plan based on the on-site construction environment and strictly in accordance with the construction drawings. Choose construction materials reasonably, and make technical clarifications on the temperature, time, non-destructive testing of materials and process parameters for preheating and heat treatment. In groove processing, ion arc or oxyacetylene can be used, which is fully combined with on-site construction. After the processing is completed, the oil stains at the groove must be removed, and clean the oxide scale, molten slag and uneven part. Ensure the accurate positioning of the pipe joints and make the grooves conform to the construction requirements. In addition, the inner wall of the connecting pipe should be kept flush, and the misalignment should be controlled within the specified range. The uneven thickness of the groove should be ground. The material selected for fixed-position welding should be consistent with that of the root welding.

 


Post URL: https://www.landeepipe.com/the-installation-of-boiler-tubes-in-power-plants.html
Landee Pipe is a professional industrial pipe manufacturer based in China, we have been producing pipe for a variety of applications, and covering areas of pipe manufacturing, exporting and trading. welcome to access our website: https://www.landeepipe.com.


Name*
E-mail*
Rate*
Comments*
About the author
Teresa
Teresa
Teresa is a skilled author specializing in industrial technical articles with over eight years of experience. She has a deep understanding of manufacturing processes, material science, and technological advancements. Her work includes detailed analyses, process optimization techniques, and quality control methods that aim to enhance production efficiency and product quality across various industries. Teresa's articles are well-researched, clear, and informative, making complex industrial concepts accessible to professionals and stakeholders.